Create and manage project milestones
Pixie CRM guidance. Follow the route for your workspace, check your role and enabled modules, and verify the result before moving on.
Break delivery into ordered stages with due dates and visual status.
Learn with Pixie CRM
Video walkthroughs for this guide
Follow real application screens at your own pace, with English captions and a matching written guide.
Create a project milestone
Create a project milestone in Pixie CRM with live clicks. Set its name, dates, description, customer visibility and order, then save and confirm it in the project.
Explore 1 more tutorial for this workflow
Assign a task to a project milestone
Organise a project task into a milestone in Pixie CRM. Follow the live drag-and-drop workflow, then reopen the board to confirm the assignment was saved.
Recorded in a demonstration workspace; available options depend on your plan and permissions.
Visit the Pixie CRM YouTube channel
What this guide helps you do
Break delivery into ordered stages with due dates and visual status. Pixie CRM keeps the result connected to the relevant customer, staff member and operational history where the feature supports those relationships. That connection is important for search, reporting, client portal visibility and future automation.
Follow these steps
- Go to Project → Milestones and select the relevant record or setup list.
- Use search, filters or status tabs to confirm you are working on the intended item.
- Check linked records, activity and permissions before changing status, ownership or visibility.
- Use the available edit, status, reorder, attach, copy or delete action as required.
- Complete any confirmation dialog carefully; destructive actions may be restricted when linked data exists.
- Check the updated state in the list and record view.
- Check downstream client portal, reporting or automation effects where applicable.
Settings to check
Checks before you finish
- Choose billing type before time is recorded.
- Add only the staff who need access.
- Review client-visible content before publishing.
- Check whether the result should be visible to a customer contact or only to staff.
- Confirm the final status, activity entry, generated document or notification before leaving the record.


