Run the post-upgrade security verification checklist
Pixie CRM guidance. Follow the route for your workspace, check your role and enabled modules, and verify the result before moving on.
Verify every included hardening item before closing the release change.
Where to goSupported Pixie CRM deployment and database-upgrade process — no staff menu route
What this guide helps you do
Verify every included hardening item before closing the release change. The workflow below follows the supported application or module flow and does not invent a menu or bypass validation.
Follow these steps
- Use the supported Pixie CRM release or workflow that produces this security control.
- Check the expected protection through an authorised test.
- Record the result in the deployment or security audit evidence.
Fields and options
- Evidence for every included control
- Change and rollback record
Rules and limits
- Verify migrations 342 and 040.
- Test staff/client login, 2FA and all throttles.
- Verify Argon2id and a controlled phpass upgrade.
- Test API-token expiry, revocation, rotation and metadata.
- Inspect cookie flags, session regeneration, TLS, proxy, headers, CSP reports, audit events and web-server protections.
- Provision one controlled future tenant.
Check it worked
- The protection is active without weakening another security control.
Security, audit and troubleshooting checks
- Use the exact authorised account, role and record before saving or sending.
- Verify the saved status and downstream record; a browser success message alone is not sufficient evidence.
- Never expose passwords, API keys, access tokens, protected attachments or raw server paths in support tickets.
- Do not edit module or core database records directly to bypass validation, permissions, migrations or state rules.
Related guides
Was this guide useful?Your response is stored only in this browser.
